Skip to content

R12 · Intelligence product

Technology radar

What it is for. Assess maturity from different dimensions.

Excel (.xlsx)Word (.docx)PDF for printingText (.md)See the template

The four downloads (Excel, Word, PDF and text) are generated from this same sheet.

When to use it. Before making a decision or updating the corresponding product. You can use a spreadsheet, a document or a notebook; no software licences are needed.

How to use it

  1. Start with the real decision or question you need to resolve and set a cut-off date.
  2. Fill in only what can be verified; write NOT VERIFIED when data is missing.
  3. Separate observed facts, hypotheses and implications, and name a reviewer.
  4. Keep the original version and record relevant changes when you update it.

Do it yourself

Editable template

Support scale (the same as in lesson 5.2 and Lab L07): solid / partial / insufficient / not assessable. “Not assessable” means data is lacking; it is not a zero.

Dimension Indicator Evidence and date Support Limit Open question
Technical performance
Industrial maturity
Adoption
Ecosystem and supply
Strategic fit

Environment, regulation and constraints (cross-cutting field):

Company A case · simulation

Fictional case

Guided example · Company A

For Company A there are positive technical indications from tests, but not enough data on unit cost or durability in production.

Educational simulation: fictional information and organisations.

Mistake to avoid

Patents, publications, demonstrations and sales are different signals; they are not equivalent measures of maturity.

Final check

  • Is it clear which decision or need it serves?
  • Can the evidence be located, and is it dated?
  • Are uncertainties and limits made explicit?
  • Can someone else repeat or review the work?

Notice: entirely fictional case. The tools are for educational purposes; they do not represent an audit or certification.